executive house block paving 10

Block Paved Driveway

This week we was at our customers property in Lancashire, removing an old block paved driveway and replacing it with a new driveway to the front of the property. Firstly, we dug up the old driveway, The old blocks were removed and disposed of. We then dug up the driveway and the large area to…

Details
lancashire patio project back garden 17

Back Garden Patio Design

For this project, we had to remove all of the lawn, a few bushes and shrubs and any old concrete that was in the garden. These were all replaced with sandstone paving slabs which created a lovely patio area to each level of the garden. We also designed a garden path that would lead down…

Details
lancashire landscaping 10

New Landscaped Garden

For this landscaping project we had to remove all trees with the roots and all the bushes that were in the garden.These were all disposed off in a professional manner. The old turf was removed and replaced with grade A topsoil. The old fence panels to the back and side of the garden were all…

Details
lancashire garden patio 07

Indian Sandstone Pathway

For this project, we was asked to remove an old worn concrete driveway and replace it with a new indian sandstone pathway. The cracked pathway was dug up by using a mini digger and disposed of in the correct manner. The indian sandstone paving slabs were then laid on top of the flat surface. There…

Details
block paving after

Block Paving Driveway

Our next project was to design and install a new block paving driveway. The front of our clients house consisted of a concrete driveway, a small concrete path and grass to the side of both. We started by digging up the whole area. This was then levelled off, ready for the block paving to be…

Details
resin bound driveways 01

Resin Bound Drives

We have just completed installing this resin bound driveway for our customers in Lancashire. Even though we had to dig up an old concrete driveway, some of the shrubs, bushes and a small tree, the project only took us five days to complete. We dug up the concrete by using a mini digger. We disposed…