For this project, we was asked to remove an old worn concrete driveway and replace it with a new indian sandstone pathway. The cracked pathway was dug up by using a mini digger and disposed of in the correct manner. The indian sandstone paving slabs were then laid on top of the flat surface. There were three old drain covers that needed to be removed and replaced with three new drain covers using the indian sandstone paving slabs. This project took under a week to complete.
Our clients were happy with the results.